IT PROJECT ACTIVITY REPORT
April 28th, 2003
IT Infrastructure Projects
ID Short Description Status Initiated By Assigned To Full Description Recent Activity
1 New Dept Mail Server setup Active IT Shop dmarlin setup Sun Ultra E-150 as the new dept e-mail server; sendmail, procmail, pine, sanitizer, mailman, migrate user accounts running mail server; running mailist manager; need to test user accounts; install virus scanner
2 Maillist Server Upgrade Active IT Shop dmarlin install and configure Mailman; a new bulk mail list server w/ web front-end.  Migrate all exsiting maillist to this new service;  run from new mail server Mailman running on sunny; some lists migrated; migrate rest; upgrade
3 New Dept Web Server Planning IT Shop dmarlin setup new Linux server as the dept web server.  Finalize website design and rebuild all content for new server.  Determine how to handle individual web space produced a prototype design for use with new website
4 IT Shop website Completed IT Shop dmarlin put into production the new IT Shop website website up; need to add more information
5 Setup NetReg Server Active IT Shop dmarlin & carusone setup new Linux server to act as the dept's DNS, DHCP, and network registration server.  All network devices to be registered before network use allowed. began installation as a test.
6 New Dept Group File Server Planning IT Shop dmarlin setup research group file server on share.chem using SAMBA to move file storage off devnull file server new boot drive for share.chem purchased
7 New centralized log server None IT Shop dmarlin setup a new server to act as a centralized log server for all unix hosts and Win2K server to log to.  
8 Reorganize Network Closets None dmarlin carusone rewire and reorganize each of the 16 communication closets.  Place all equipment in racks.  Label and validate connections.  
9 Remove Thinnet None dmarlin carusone terminate thinet networking and remove thinet repeaters from each of the 16 communication closets.  Convert any existing dependancies to 10BaseT.  
10 Install new CRB switches Completed dmarlin carusone install new network switches in CRB comm closets and migrate network ports from existing hubs to new switches. switches installed in closets and getting fiber feeds.
11 Network Services Inventory Active dmarlin dmarlin & carusone setup a linux workstation/server to inventory all network services on each subnet and validate needed services, document need, user, software, versions, etc. netscan setup using nmap, need to install Nessus instead.
12 Unix/Windows password Sync None dmarlin dmarlin & carusone review the options for syncing passwords between Solaris/Linux and Win2K AD using Microsoft's Services for Unix 3.x product Services for Unix 3.0 purchased
13 Web based Request Tracking Planning dmarlin mglover install and setup RT system to review how well that product might work for us as a web based, online, automated user request tracking system. reviewing installation docs
14 DHCP Server Down Completed IT Shop dmarlin puma died, won't boot, dhcpd.conf needs to be recovered and moved to new server (tux). relocated DHCP to tux
15 Email Virus Scanner Down Completed IT Shop dmarlin email virus scanner on mailey is broken; no virus scanning being done.  Need to install the latest version of the procmail sanitizer and configure to our needs. restored email virus scanning service on mailey
16 Dept Security Review Response Planning IT Shop dmarlin initiate changes in procedures, policies, and practices in response the Dept's security review conducted by Predictive Systems  
User Initiated Projects
ID Short Description Status Initiated By Assigned To Full Description Recent Activity
1 Rebuild sunspec Ultra 10 Completed Powell dmarlin rebuild Sun Ultra 10 as a new workstation to serve as a data backup system and an Xmass workstation installed Xmass; verify install; setup disk mirror
2 Video Conferencing, Duran Completed Duran dmarlin & carusone coordinate video conferencing setup between Duran and colleague in Germany. Explore use of video conferencing for Chem & QTP for faculty meeting & seminars equip ordered and arrived.  Need to test and deliver.
3 BA3 Accounting Completed Fiscal dmarlin coordinate needs related to BA3 implementation.  Install client on multiple machines, work w/ Eric to get persons file updated with latest bethd updates. installed client on all fiscal PCs and two Main Office PCs
4 Gaussian 03 site License Pending Micha dmarlin coordinate the purchase of a Gaussian/Win site license for Chemistry deferred to Deumens @ QTP
5 Comp Chem Course Lab Completed Micha dmarlin & mglover coordinate the purchase of two PCs, network printer, and software to support the new computational chemistry course. systems ordered and installed; waiting for Gaussian 98/Win
6 Groupware Calendar Server Planning Chair dmarlin & carusone review options for creating a groupware type calendar server that is both web based and provides hooks for MS-Outlook client for use by the Business Ofc installing and reviewing Bynari's InsightServer and Connector.
7 Message Board Server Planning Duran dmarlin & mglover review options for hosting a threaded, web based message board server. reviewing options
8 Dept Info Display System Planning Chair carusone electronic presentation system mounted near LEI 2nd floor mailboxes to provide dept announcments and seminar notices.  Editable by multiple individuals considering a web based/html solution; full screen web display
9 Stock Room Inventory Control Active Webb dmarlin review software system available to provide inventory control system to replace the antiquated and failing DACeasy product currently in use. Taking a serious look at eRPortal
10 Dept Multimedia Cart None Chair dmarlin persue the purchase and assembly of a multimedia cart for general dept use.  Projector, laptop, VCR, TV/Monitor, etc  
11 Media Services PC upgrade Pending R. Pierce carusone & dmarlin coordinate with Russ to help spec, approve, purchase, and implement new PC hardware for CLB 130. provided specs & quotes for new equipment.  Waiting for purchase
12 POS software for Stockrooms Active S. Webb dmarlin evaluate new software to be used to manage stockroom inventory, sales, and customer accounts.  Networked to use by other Shops. reviewed Quickbooks now looking at Intuit POS and others.
13 Create employee maillist Pending Chair dmarlin use Beth's MS-Access table to create/maintain an employees@chem maillist. pending changes that Betth wants to make to her Access table.
14 TA authenticated log time Planning Vala carusone looking into biometric solution to log when TA's come/go at the learning center reviewing options
15 Dept Projector Sched Form Active Rench dmarlin create a web based scheduling form for users wanting to use the Department's video projector to be checked out by Fiscal office initial form created
16 web policy compliance Active Chair dmarlin review of user's compliance with current local web policies